• 1 The Arc, Bury St Edmunds
    2805 Panels of 254 types, all culminating on one of the most visually stunning projects in the company's history.
    Click here to read more
  • 2 The Arc, Bury St Edmunds
    2805 Panels of 254 types, all culminating on one of the most visually stunning projects in the company's history.
    Click here to read more
  • 3 B & Q, Shrewsbury
    River-Therm® was specified for B&Q Shrewsbury because of the portable rolling technique that allows the sheets to be rolled directly onto the roof.
    Click here to read more
  • 4 B & Q, Shrewsbury
    River-Therm® was specified for B&Q Shrewsbury because of the portable rolling technique that allows the sheets to be rolled directly onto the roof.
    Click here to read more
  • 5 Prologis 360
    Work on ProLogis 360 was carried out by CA Roofing Services, bringing to the project a wealth of experience, knowledge and unparalleled energy performance.
    Click here to read more
  • 6 Prologis 360
    Work on ProLogis 360 was carried out by CA Roofing Services, bringing to the project a wealth of experience, knowledge and unparalleled energy performance.
    Click here to read more
  • 7 Jaguar / Land Rover
    Jaguar/ Land Rover are set to save 19 tonnes of CO2 per year thanks to the revolutionary SolarWall® Transpired Solar Collector (TSC).
    Click here to read more
  • 8 Jaguar / Land Rover
    Jaguar/ Land Rover are set to save 19 tonnes of CO2 per year thanks to the revolutionary SolarWall® Transpired Solar Collector (TSC).
    Click here to read more
  • 9 Sustainability
    The Sainsbury's distribution centre at Pineham was the world's first Planet Positive building and received a World Green Building Award.
    Click here to read more
  • 10 Sustainability
    The Sainsbury's distribution centre at Pineham was the world's first Planet Positive building and received a World Green Building Award.
    Click here to read more
Technical Information Papers

Our Technical Notes are currently being revised and will be reissued under the new name, Technical Information Papers (TIPs).

Please ensure you check this page for the most up to date information.

If you require one of the older Technical Notes, please contact our technical team via email: technical@cagroup.ltd.uk or telephone: 01388 830 294

Installation Issues
  • TIP-101 (Replacing TN-24)
    CABP System Non-Fragility Tolerances
    Rev 1
    PDF Download
  • TIP-102 (Replacing TN-01)
    Therma-light Rooflight Installation
    PDF Download
  • TIP-103 (Replacing TN-10)
    PVC Rooflights & Non-Fragility
    PDF Download
  • TIP-104 (Replacing TN-01)
    GRP Therma-light Rooflight Damage
    PDF Download
  • TIP-105 (Replacing TN-29)
    Leaking & Mis-Drilled Fasteners
    PDF Download
  • TIP-106 (Replacing TN-31)
    Walkable, Non-Walkable & Walking on Roof Cladding
    PDF Download
  • TIP-107 (Replacing TN-44)
    Steelwork Tolerances
    PDF Download

Back To Top

Fire

Back To Top

Performance / Guarantees

Back To Top

Specifications Issues
  • TIP-401 (Replacing TN-02)
    Acoustics
    PDF Download
  • TIP-402 (Replacing TN-04)
    Breather Membrane, Humidity & Condensation
    PDF Download
  • TIP-406 (Replacing TN-33)
    Thin Gauge Purlins
    PDF Download

Back To Top

CABP System Performance

Back To Top

Fabrication / Production / Design Issues
  • TIPs Coming soon

Back To Top