• 7 Jaguar / Land Rover
    Jaguar/ Land Rover are set to save 19 tonnes of CO2 per year thanks to the revolutionary SolarWall® Transpired Solar Collector (TSC).
    Click here to read more
  • 8 Jaguar / Land Rover
    Jaguar/ Land Rover are set to save 19 tonnes of CO2 per year thanks to the revolutionary SolarWall® Transpired Solar Collector (TSC).
    Click here to read more
  • 1 The Arc, Bury St Edmunds
    2805 Panels of 254 types, all culminating on one of the most visually stunning projects in the company's history.
    Click here to read more
  • 2 The Arc, Bury St Edmunds
    2805 Panels of 254 types, all culminating on one of the most visually stunning projects in the company's history.
    Click here to read more
  • 3 B & Q, Shrewsbury
    River-Therm® was specified for B&Q Shrewsbury because of the portable rolling technique that allows the sheets to be rolled directly onto the roof.
    Click here to read more
  • 4 B & Q, Shrewsbury
    River-Therm® was specified for B&Q Shrewsbury because of the portable rolling technique that allows the sheets to be rolled directly onto the roof.
    Click here to read more
  • 5 Prologis 360
    Work on ProLogis 360 was carried out by CA Roofing Services, bringing to the project a wealth of experience, knowledge and unparalleled energy performance.
    Click here to read more
  • 6 Prologis 360
    Work on ProLogis 360 was carried out by CA Roofing Services, bringing to the project a wealth of experience, knowledge and unparalleled energy performance.
    Click here to read more
  • 9 Sustainability
    The Sainsbury's distribution centre at Pineham was the world's first Planet Positive building and received a World Green Building Award.
    Click here to read more
  • 10 Sustainability
    The Sainsbury's distribution centre at Pineham was the world's first Planet Positive building and received a World Green Building Award.
    Click here to read more

Welcome to CA Refurbishment Projects

CA Refurbishment Projects embodies some 30 years of experience within the sector.

The division’s scope of works encompasses:

  • Capital refurbishment of existing premises.
  • Removal and replacement of the complete existing cladding envelope.
  • Planned maintenance regimes.
  • Flat to pitched roof conversion.
  • Prefabricated building erection.
  • Sarna membrane and liquid plastic systems.

Recent projects include the over-roofing of a newly completed project in Middlewich and the installation of the SolarWall® Transpired Solar Collector (TSC) for the new Jaguar / Land Rover training academy in Warwick.


CA Group Latest News:

CA Group Achieves ISO14001 Accreditation

CA Group has today announced that it has achieved ISO14001 accreditation for the design, manufacture, supply and installation of its metal roofing and cladding systems and the associated components. This BSI (British Standards Institution) accreditation, which represents the environmental management system standard, demonstrates the company’s commitment to reducing its environmental footprint and decreasing the amount of [...]

CA Group News | 30 Jan 2012

Sky’s The Limit For CA Group As Innovative Curved Roof Is Unveiled

  CA Group has unveiled the unique curved roof system design that it has developed for Prologis.  The new roof system has been used for the first time at the new BMW Group (UK) Ltd distribution facility at Prologis Park, Pineham, in Northampton. The project, which was carried out in conjunction with Buckingham Group, is [...]

CA Group News | 18 Jan 2012

Auditing the Carbon Neutrality of Amazon’s New Mega Shed

As credible carbon reduction strategies become an essential component of business success, the specification of carbon neutrality – or a net zero carbon footprint -is becoming an intrinsic part of new building projects. The recent announcement by specialist building envelope manufacturer and installer, CA Group, that it has completed work on the latest carbon neutral [...]

CA Group News | 15 Dec 2011

CA Group Takes The Fast-Track For New Amazon Distribution Centre

Specialist roofing and cladding manufacturer and installer, CA Group, has announced that it has completed work on what has been described by the company as ‘an incredibly fast installation’. The project, an 80,000m2 distribution centre for Amazon, in Dunfermline, had the roof and walls successfully installed in just 14 weeks as per the agreed schedule, [...]

CA Group News | 12 Dec 2011

CA Group Highlights UN Report Urging Developers To Consider The Use Of Fibre Insulation

Specialist building envelope manufacturer and installer, CA Group, has today highlighted a new report published by UNEP, the United Nations Environment Programme. The report warns of the cost to the environment of what were previously believed to be ‘ozone friendly’ HFCs and urges investors and developers to consider the use of fibre, rather than foam [...]

CA Group News | 28 Nov 2011

Lateral Thinking Gets Job Done For Data Centre

Specialist building envelope manufacturer and installer, CA Group, has announced that it has successfully installed its River-Therm® secret fix roofing solution on three data centres in Slough – in spite of the buildings being located within a three metre distance of each other. Martin Lowther, Operations Director for CA Group, explained that the contract, carried out [...]

CA Group News | 25 Oct 2011